Thursday, 3 December 2015

Filming schedules for filming days


\Day 1 (Cut away) 18/11/15

13:00 – 13:10
Collect equipment from Silverstone storage room
13:20 -13:45
Get train to Lewis and taxi to Raystede
14:00
Arrive and talk to staff about the production section of the day          

14:30
Set up equipment at right location

16:00
Film the Cut aways in the locations talked about with stuff
16:50
Leave to catch train and taxi back to Falmer























Day 2 (Interview filming) 24/11/15

10:00
Collect equipment from Silverstone storage room
10:15
Catch train to Lewis and a taxi to Raystede
11:00
Meet and sit down with staff to talk about what needs to be done and what angle they will be done at
11:30
Set up camera and lighting equipment at first location
11:40
Start filming first interview
11:50
Move equipment to second location
12:00
Continue filming with second interview
12:10
Move camera equipment to the third location
12:15
Start filming third interview
12:30
Go and capture more cut away footage because of the responses of the interview
12:50
Have another talk about how the staff want the editing to look and to show footage we have collected
13:00
Pack up equipment
13:20
Get taxi and train back to Falmer

Tuesday, 1 December 2015

Filming Day Two


On the second day of filming we used to film cutaway shots of mostly animals and the location 



Filming day one



Getting the animals to stay still or to prevent them from blocking the camera vision was very challenging, especially as we were very limited in the spaces we were given access to film in. 





 In our first filming day the focal point was on the interviews and the people we were filming as we planned to return on a later date to film the cut aways as then we would have a better idea of what we were looking for

Equipment:
-Sony HVR-Z1E shooting kit (x2)
-White/silver reflector



The tasks i was involved with include, directing, holding the reflector, filming, positioning the cameras and photographing the process 

We had issues with the team at Raystede, the subjects we were filming gave us difficulty within the interviews, trying to turn it into a promotional video, so we had to overcome this by spending a lot more time filming and asking the questions in a variety of ways 





Train tickets for filming day